Are you aware of the target audience for the NACE CIP1-001 Exam?
The NACE CIP1-001 test is designed for professionals and students. The professionals need to be certified by the NACE CIP1-001 exam as they are going to work in any part of the world. They need a good skill set of knowledge in the coatings. The students can prepare themselves for the NACE CIP1-001 exam to get good marks. Real exam questions will help them to easily pass the NACE CIP1-001 exam. You can easily study with the help of the NACE CIP1-001 exam dumps as the exam dumps contain the latest and updated versions of the NACE CIP1-001 test. The payment fee will help the students to easily manage their time during the preparation.
NEW QUESTION 43
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use
- A. a detailed checklist and document the lack of a standard.
- B. NACE 2/SSPC SP10
- C. a recognized industry standard like SSPC-PA 2 that is broadly accepted
- D. their best judgment based on similar projects and specifications.
Answer: C
NEW QUESTION 44
What is the minimum spot measurement value allowed by SSPC-PA 2 in each 10 m2 (100 ft2) area?
- A. 80% of the specified minimum thickness
- B. 100% of the specified maximum thickness
- C. 90% of the specified maximum thickness
- D. 70% of the specified maximum thickness
Answer: A
NEW QUESTION 45
Conventional spray is a good choice when:
- A. High production rates are required
- B. High viscosity coatings are being applied
- C. High transfer efficiency is required
- D. High quality finishes are required
Answer: D
NEW QUESTION 46
Upon arrival of coating materials, the inspector should
- A. observe and document the amount of material and batch numbers.
- B. observe aryl document that the applicator WFT at regular intervals during application.
- C. review coating contractors' plans for storage of coating materials and confirm they meet national, local and owners' fire and environmental regulations.
- D. observe and document time frame and environmental conditions between each coat.
Answer: A
NEW QUESTION 47
Daily reports are important because:
Select All That Apply
- A. The information aids communication with supervisors.
- B. Inspectors rarely change on a project.
- C. Management uses them to make personnel decisions.
- D. the information impacts future projects.
Answer: A,C,D
NEW QUESTION 48
You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining is being applied. After application of the 19 coat you notice small blisters in some areas of the applied lining.
Your FIRST preferred course of action is to:
- A. Document the problem and advise the Contractor and Owner's representative
- B. Break the blisters to see what's inside
- C. Document the problem and advise the Contractor
- D. Extract any liquid that may be inside the blister and send it to the lab for further analysis
Answer: A
NEW QUESTION 49
Inspection documentation is important because:
- A. Owners use the documentation for a variety of purposes
- B. a) only
- C. a) & b)
- D. It is the only deliverable item provided by the inspector
Answer: A
NEW QUESTION 50
When working as a NACE Inspector in a situation where there is a difference of opinion, the Inspector needs to:
- A. Achieve consensus through negotiation
- B. Never change his/her mind
- C. Go with the majority opinion
- D. Call the supervisor
Answer: D
NEW QUESTION 51
In the event of a conflict between the project specification and the coating manufactures' product data sheet, the Inspector's first course of action should be too:
- A. Call the person who wrote the specification for clarification
- B. Call the coating manufacturer for clarification
- C. Use the product data sheet as a guide
- D. Use the job specification as a guide
Answer: D
NEW QUESTION 52
If a contractor is using a poorly maintained compressor to supply air for abrasive blast cleaning and conventional airspray, the coating inspector should perform a
- A. blotter test for the presence of oil and water.
- B. wet film thickness (WFT) measurement.
- C. vial lest.
- D. dry film thickness (DEI) measurement.
Answer: A
NEW QUESTION 53
You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
- A. Abrasive blast nozzles
- B. Power tools
- C. Hand tools
- D. Airless spray equipment
Answer: B
NEW QUESTION 54
You are the NACE Coating Inspector on an exterior job where the contractor is not using any environmental controls, For the last several hours your reading; indicate the relative humidity is rising and the substrate temperature is dropping. The sky is clouding over and the weather forecast is for evening showers. It is now 4 PM, your readings indicate you have minimally acceptable environmental conditions, however if the current trend continues, you expect to be outside specified conditions soon. The contractor advises you he is going to mix up the next full kit to complete his for the day.
Your FIRST preformed course of action is to:
- A. Advise the Contractor he can proceed
- B. Call your supervisor
- C. Advise the Contractor of your readings
- D. Advise the Contractor he cannot proceed
Answer: C
NEW QUESTION 55
When using the ISO comparator in accordance with ISO 8503, if the surface profile does not directly compare to one of the four segments the inspector should:
- A. Record the segment with the more aggressive profile
- B. Record the segment with the less aggressive profile
- C. Record your result by identifying two segments
- D. Use another method as the comparator method is too subjective
Answer: B
NEW QUESTION 56
Check abrasive blast pressure close to the
- A. blast nozzle
- B. blast pot
- C. compressor
- D. substrate
Answer: A
NEW QUESTION 57
NACE SP 0178 is a standard for:
- A. Stainless steel pipe to be Externally Coated
- B. Tanks and Vessels to, be Lined for Immersion Service
- C. Structural steel to be coated for Atmospheric Service
- D. Tanks and Vessels to be Externally Coated
Answer: B
NEW QUESTION 58
The most important factor resulting in improved job site safety is:
- A. Engineering Controls
- B. Situational Awareness
- C. Personal Protective Equipment
- D. Safety Enforcement
Answer: B
NEW QUESTION 59
Whenever dissimilar metals must join, the most common practice is to
- A. avoid coating all connected dissimilar metals.
- B. provide cathodic protection to prevent corrosion,
- C. provide anodic protection to prevent corrosion.
- D. coat all connected dissimilar metals.
Answer: D
NEW QUESTION 60
Dew point is the temperature at which
- A. humidity decreases
- B. the air is saturated.
- C. water freezes.
- D. condensation occurs.
Answer: D
NEW QUESTION 61
An inspectors personal log book should contain:
- A. No comments regarding the application team
- B. Objective comments regarding the application work
- C. The inspector's personal opinions of the application team
- D. Subjective comments re ding the application team
Answer: A
NEW QUESTION 62
Non Conformance Reports are completed by the Inspector:
- A. In every instance that an item does not meet the specification requirements
- B. When the Inspector and Contractor deem it to be a significant non-conforming item
- C. In accordance with the specification's definition of a non-conformance
- D. When the Inspector deems it to be a significant non-conforming item
Answer: B
NEW QUESTION 63
......